SCHEDULE CERTAINTY THAT PROTECTS REVENUE

Akordi finalist in the AFR BOSS Innovative Companies 2025

The Challenge During the planning phase of an 800 MW transmission line, the Client faced tight timeframes and resource limitations from camp site capacity constraints along the route.

The Approach Akordi deployed AI-enabled simulations to test delivery approaches, crew composition, and deployment options, quantifying schedule impacts while maintaining feasibility constraints.

The Impact

  • 8% schedule reduction between explored options
  • 40% improvement in resource optimisation
  • 4x increase in schedule and completion certainty
  • Critical insights on offsite assembly and crew optimisation
  • Constraint-aware planning factoring geography and workforce distribution

Related Resources

Article Link

Digital Risk Intelligence: Preventing 10-Month Project Delay

Sep 22, 2025
Case Studies
Article Link

Road Infrastructure: De-risking a Multi-Billion Dollar Megaproject

Sep 22, 2025
Case Studies
Article Link

Renewable Energy: Building Resilience in Wind Farm Delivery

Sep 22, 2025
Case Studies
Article Link

Mining & Resources: Unlocking 5.4% Project Cost Savings with Generative Scheduling

Sep 22, 2025
Case Studies
Button Text